AREI GROUP
FIELD ESTIMATOR · VERSION 2
V2 TESTING BUILD — NOT FOR CUSTOMER QUOTES

This development version stores estimates on this browser only. Use sample customer information, export backups frequently, and do not issue proposals until pricing and approval checks are verified.

Project details

Historical pricing database

Source-dated prices from 1006 79th Street. Supplier quotes and internal allowances are labeled separately. Local changes remain on this device until backed up.

ItemUnitMaterialsLaborTypeSupplier / date

Crew-day and pricing method

Pricing changes are recorded locally in the estimate revision history. This is not an tamper-proof or management approval system. Do not issue a reduced-multiplier quote without management authorization.

For multiplier mode, direct costs already include equipped crew days, materials and subcontractors. The multiplier replaces separate overhead/contingency/profit calculations to avoid double counting. Typical planning range: 1.75–2.00×; adjust by project.

Bathroom tile takeoff · Development

Enter actual tiled dimensions in feet. Each surface uses its own tile-box coverage. Material boxes round UP; installation labor retains measured square footage.

Main bathroom floor waterproofing is excluded by default; uncoupling is a separate treatment and is not automatically a waterproof assembly. For a traditional tiled shower pan, include pre-slope mortar, waterproof liner/membrane, final mortar bed and drain/curb details; bonded systems and prefabricated trays use different assemblies and must not be double-counted. Pan assembly is a scope reminder, not yet a material quantity or priced line. Waterproofing shown is preliminary shower-wall and tiled-shower-floor area, plus main bathroom floor only when waterproof-floor treatment is selected. Uncoupling roll coverage is an editable illustrative default, not a verified product specification. Actual systems may require overlaps, seams, niches, curbs, tub surrounds, pan detailing, or additional substrate areas. Verify the selected manufacturer's approved assembly and packaging. This calculator does not price installation and must not duplicate work already included in a $5,200 subcontractor package.

Build scope by room

AreaScope descriptionUnitQtyMaterial $/unitLabor $/unitDirect cost

Enter your estimated direct material and labor costs. Markups are calculated below; customers only see the proposal total.

Pricing calculator

Overhead and contingency are added to direct costs; profit is calculated as a margin on the final selling price (not a simple markup).

Direct cost$0.00
Overhead + contingency$0.00
Proposed price$0.00

Proposal settings

Saved estimates

Backup includes estimates, your pricing database, and pricing settings. Estimates are stored only in this browser on this device. Back up regularly. Clearing browser data can erase estimates.